WASTE MANAGEMENT FACILITIES

PRE-STudy with Swerock

Ongoing storm water treatment for a waste management facility handling construction waste in Malmö.

The current project involved installing a treatment system with capacity to treat approximately 15 l/s (54 m3/h).

The next step will be the installation of a full-scale system with treatment capacity of 50 l/s (180 m3/h).).

Leave a message!

Kristineholmsvägen 26 A
441 39 Alingsås
SWEDEN
+46 (0)322-12747