Waste Management Facility

WASTE MANAGEMENT FACILITIES PRE-STudy with Swerock Ongoing storm water treatment for a waste management facility handling construction waste in Malmö. The current project involved installing a treatment system with capacity to treat approximately 15 l/s (54 m3/h). The...

Shale Quarry Process Water

SHALE QUARRY PROCESS WATER Pre-Study Ongoing project involving a treatability study and the design to treat process water from a shale quarry process plant. The water holds very high levels of suspended sediments. The results of the treatability stud showed over 95%...

Tunnel wash water treatment

GNISTÄNGSTUNNELN TUNNEL WASH WATER TREATMENT Treatment feasibility study of tunnel wash water and design of a treatment system capable of treating all tunnel wash water in Gothenburg. Utilizing Swedish Hydro Solutions chitosan and BioMedia treatment, suspended...