Hagalund Work Tunnel

Chitosan flocculation in large-scale tunnel projects is very effective. In order to test the same technology used by several West Link projects, the international construction company Implenia decided to purchase an entire system, including professional services, from Swedish Hydro Solutions.

Hagalund Work Tunnel

The “Yellow Line” is the working name of a new metro line in the city of Stockholm, which will be completed by the end of the present decade. In order to facilitate the building of the main tunnel on this new route, a so-called work tunnel first has to be excavated; a project managed by the construction company Implenia.

The work tunnel as well as the main tunnel are treated as two individual projects, but both share the same need to treat the drainage water generated during tunnel excavation. The client, the regional authority of Stockholm, therefore required that the water treatment equipment is purchased by the first project – in order for it to be handed over to the subsequent project thereafter. For Implenia, this requirement created a golden opportunity. They wanted to test the treatment equipment they already had used with great success in the Johannelund project – equipment from Swedish Hydro Solutions – on their own and on a larger scale..

Purchased a system including a service agreement

In the Johannelund project, Swedish Hydro Solutions’ technology was first used as a complement solution to Implenia’s existing treatment system. Implenia’s own systems treat water using sedimentation, but do not handle dissolved metals, which the systems from Swedish Hydro Solutions can do. And in the Hagalund Work Tunnel project, they wanted to see how the technology would perform when acting completely independent.

– We are function testing the whole system to see if Swedish Hydro Solutions’ technology is suitable for our operations. We excavate tunnels, which is different from earth excavation, as we mostly remove crushed rock, says Daniel Zetterman, Machinery Manager at Implenia.

To meet the client’s requirement that the water treatment technology can be transferred to the main tunnel project, Implenia purchased a complete mobile water treatment system from Swedish Hydro Solutions instead of just renting one. This is the first time Swedish Hydro Solutions has ever agreed to sell a complete system. Implenia simultaneously signed a service agreement with Swedish Hydro Solutions when purchasing the system.

Service and support are a huge part of a delivery. For us, this is at least as important as the price and core performance of the system, because a product is worthless if it does not work. Swedish Hydro Solutions has handled the support well in my opinion, says Daniel.

Clean water

Before installation, Swedish Hydro Solutions conducted a pre-study to dimension the system that would be needed, based on calculated flows and what pollutants had to be taken care of. The result of the prestudy was the installation of a system consisting of a container dosing chitosan and other additional precipitation chemicals to flocculate suspended materials and precipitate dissolved metals. The system also included pH control, dosing of RedOx3 to reduce chromium VI to chromium III, sedimentation containers, automatic and online water quality monitoring, and an automatic sampler.

– After the start-up period, the water treatment works well. Once the project has been completed and we can compile the costs, we will evaluate the economics of the costs per cubic meter of water.

Is there any advantage to buying a system rather than renting?

– It is always an advantage to own. Then you are more familiar with how the system works and there is more own commitment in the operation in terms of performance monitoring and maintenance.

Excavation of the Hagalund Work Tunnel began in January 2020, and Swedish Hydro Solutions set up the system in December 2020. The project will run well into 2022.

Service and support are a huge part of a delivery. For us, this is at least as important as the price and performance of the system, because a product is worthless if it does not work. Swedish Hydro Solutions has handled the support well in my opinion.

Daniel Zetterman

Machinery Manager, Implenia

Need more information?

Carl-William Kalholm - sales coordinator

+46 723 05 80 85
carl-william.kalholm@swehydro.com

More images

More projects

West Link – Central Station

West Link – Central Station

The West Link section “Central Station” project is NCC’s largest construction contract ever. Swedish Hydro Solutions has been contracted for the water management in this project.

read more
Project Olskroken

Project Olskroken

Project Olskroken with Peab Prior to the large infrastructure project, known as the West Link, Swedish Hydro Solutions method for water treatment using chitosan is evaluated at Olskroken.Good results in the pre-study before the construction of the West LinkProject...

read more
Jernhusen, Region City

Jernhusen, Region City

Jernhusen, Region City During a geotechnical field study for a city development project at Gothenburg Central Station, property manager Jernhusen needed a water treatment solution that were able to clean drilling water. Swedish Hydro Solutions was the only company to...

read more