The Varberg tunnel

Varberg tunnel successfully reduces chromium and zinc levels The Varberg Tunnel reduced chromium levels by 96% and zinc by 86% using RedOx3 and chitosan flocculation to meet stricter requirements for treating water‑soluble metals. “Find a solution that can treat...

Johannelund

Effective treatment of chromium VI in Johannelund Over 750 liters (198 US gallons) of turbid and chromium-contaminated water – per minute. In the tunneling project Johannelund, water flows were at times very high. But despite the flow, we managed to treat the water –...

Masthuggskajen

Treatment with short notice on remediation project At short notice, a treatment plant was set up at the Masthuggkajen project. Chitosan flocculation enabled the treatment of water from a former gas station and parking lot. The Masthuggskajen area in Gothenburg is...

Fix factory

Fix Factory – concrete recycling on a classic industrial site For over sixty years, the Fix sign was a landmark in Majorna, Gothenburg. Now the factory is closed, the neon sign taken down, and 500 homes are set to be built on this classic industrial site....