by Per Turestedt | Mar 29, 2019 | Metals, Oil hydrocarbons, Suspended solids
Good results in the pre-study before the construction of the West Link Project Olskroken is one part of a much larger regional infrastructure strategy, which also includes the rail connection through central Gothenburg known as the West Link. During the construction...
by Per Turestedt | Mar 27, 2019 | Metals, Suspended solids
“A new standard for particle separation” The drilling of new pipeline tunnels under Gothenburg generates fine-grained stone flour. Swedish Hydro Solutions was hired to treat the water in a very confined space. – Filtration is extremely effective for...
by Per Turestedt | Mar 26, 2019 | Metals, Suspended solids
The drill water became crystal clear During a geotechnical field study for a city development project at Gothenburg Central Station, property manager Jernhusen needed a water treatment solution that were able to clean drilling water. Swedish Hydro Solutions was the...